AGP Picks
View all

Minnesota River Bridge resurfacing project opens Sept. 17 in Granite Falls (Sept. 14, 2026)

Latest news releases

GRANITE FALLS, Minn. – The Minnesota Department of Transportation is opening the Minnesota River Bridge in Granite Falls by the end of the day Thursday, Sept. 17. Drivers should slow down and use caution, as crews finish remaining work.

The bridge is on Highway 212 just east of Highway 23. The project provided a smoother driving surface and extended the bridge’s lifespan.

PCiRoads was the contractor for the $1.67 million project.

Stay connected

Safety in work zones

Motorists should always be prepared to encounter traffic changes when approaching work zones including lane closures, lane shifts, uneven road surfaces, slow-moving heavy equipment and slow or stopped traffic. To keep everyone safe, drivers must: 

  • Obey posted speed limits. The fine for speeding in a work zone is $300.
  • Drive undistracted. Avoid using cell phones, mobile devices, adjusting the radio – even eating –while in work zones.
  • Move over. Give workers room to safely complete their work.
  • Be patient. Expect delays, especially during peak travel times.
  • Never enter a road blocked with barriers or cones.

###

Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Share this page:

Advanced Search Options

Search for:

Search scope:

Type:

Search in:

Date range:

The last

Sort by:

Sign up for:

The Saint Paul Press

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.